When I added Develop Initial IEP to the Initial IEP meeting for a 16year-old student, the Transition Plan forms weren’t required. Shouldn’t they be?
The forms become required when Special Factors Page 2 is completed and saved....(more)
3/2/2007
| keywords -
|
635
-
What is the outcome Transition Plan – Develop / Revise / Continue for?
At the IEP before the 16th birthday and all subsequent IEP’s, a transition plan must be completed.
11/14/2006
| keywords -
|
615
-
When do I need to complete a Behavior Support Plan or a Behavior Intervention Plan?
See Procedures Manual. Required to be completed in Encore when Special...(more)
11/14/2006
| keywords -
|
585
-
When should I add a Supplemental Assessment Plan?
When any additional assessments are needed, including APE, Behavioral, OT, Psychological, PT, SLP, and vision therapy to name...(more)
10/31/2006
| keywords -
|
580
-
The Triennial Assessment Plan is showing as overdue but the Triennial Review of Eligibility isn’t due for another 3 months. Why is Encore generating an incorrect date?
The due date for this event is calculated 90 days before the Triennial Review of Eligibility is due to give case managers a reminder early enough so they can get permission for the assessment and test ...(more)
10/31/2006
| keywords -
|
578
-
When should I use a Triennial Assessment Plan?
This event contains the forms necessary to get permission for a full assessment. (It can occur more frequently than once every three years.)
10/31/2006
| keywords -
|
571
-
When should I complete an Initial Assessment Plan?
A proposed initial assessment plan must be sent when a student is referred for Special Education testing. The asses...(more)
10/30/2006
| keywords -
|
335
-
Why am I having difficulty locking an Assessment Plan?
Q: Why am I having difficulty locking an Assessment Plan?
A: When completing an assessment plan, it is necessary to add Consent and then complete the bottom of page 3 of the assessment plan before locking the event group. Currently the "red asterisk" reminder is not displayed ...(more)
4/17/2006